
Pag3
1.6 Casingandwatercollectionbasin
Thebodyoftheunitismanufacturedin“Sendzimir”galvanisedsteelcoveredwith300g/m
2
zinclayer.Asastandard,aminimum70µ
complete paint of epoxy‐polyester layer is applied on each side of the panels. The application is done by electrostatic process,
completedbyafurtheronehourstopintotheoven.Thisisgivingaconsiderableresistanceagainstwatercorrosion,ultravioletrays
andotheratmosp
hericelements.
ThispaintingprocedureisinternallynamedW‐COAT®andisgivenasstandardprotectiononallproductsmanufacturedW‐Tech.
Thelowerbodyofthecasingformsthecoldwaterbasin.Aminimum2%slopeisgranted,inordertonaturallyflowwateroutofit.On
one side of the ba
sin,a stainless steel anti cavitations suction filter is provided to protectthe re‐circulating pump that is installed
outsidethebasin.
Inthewaterbasin,thefollowingstandardconnectionsareprovided:
• Makeupwaterwithfloatvalve
• Overflow
• Drainage
Otherconnections could beprovide
dinaccordance totheadditional optionelementare possible tofit. Foraquick review andnot
limitedto,wecanmention:
• Electricheater(toavoidwaterfreezinginthebasininwintertime)
• Minimumwaterlevelswitchforheaters(toprotectelectricheatertoworkuncove
redbywater)
• Minimumwaterlevelswitchforpump(toprotectre‐circulatingpumptoworkwithoutthenecessarywaterlevel)
Fulllistofoptionsarelistedinthetechnicalsheet.
Commenti su questo manuale